February 2004 To May 2006
TOA CORPORATION - PT.ADHI KARYA (Joint Operation)
Jakarta,Indonesia
TARAHAN COAL FIRED STEAM POWER PLANT PROJECT,
CIVIL WORK AND PILING --- (LAMPUNG INDONESIA)
As a CHIEF SURVEYOR
Preliminary Survey for Construction
- Benchmark Verification
- Determining Benchmark Coordinate Value using Total Station.
Determining Benchmark Elevation Value using Auto level. - Hydrographic ( Bathymetry) Survey for Discharge Outlet Area.
Topographic Survey - Cross Section Work
- Piling Work (PC Pile) Dia 300mm, 400mm, 450mm, 500mm for building Foundation (2500 Nos).
- Piling Works (Steel Pipe Pile) Dia 612mm (1500 Nos) for Turbine Generator and Power House Foundation
- Bored Pile Work Dia 1000mm,800mm (700 Nos)
- Construction of Circulating Sea Water Pump Pit (Underground Structure)
- Construction of Administration Building 5th floor.
- Construction of Balance of Plant Building 4th floor.
- Construction of Intake tunnel 3x4x600 meter, Underground Structure.
- Construction/Installation of Corrugated Steel Pipe Dia 3.1 meter and 2.2 meter, 1200 meter long (underground pipe) for Discharge Outlet.
- Construction of Fly Over Bridge for coal transportation.
- Construction of Road inside Power Plan Area 4000 meter length.
- Construction of Ash Disposal Area 12 Hectare, cut, fill and embankment.
- Construction of Pipe Sleeper.
- Construction of Oil Storage Tank Found.
- Construction of Water Storage Tank.
- Construction of Drainage System inside Power Plan using Hume Pipe.
- Construction of Waste Waste Water Storage Pond.
- Construction of Oil Storage Tank Foundation.
- Responsible 8 Team of Surveyor.