Project Experience-3 SURVEY ENGINEER

February 2006 To April 2006

ADHI KARYA.PT ------------ Aceh, Indonesia

URGENT RECOVERY OF THE WEST COAST ROAD

BANDA ACEH AND MEULABOH PROJECT (CALANG MEULABOH SECTION )

KM. 155+630 to KM 270+000.

**AFTER TSUNAMI DISASTER..


As a SURVEY ENGINEER



Preliminary Survey for Construction

  • Establishment New Benchmark
  • Determining Benchmark (Establishment New Benchmark) Coordinate adjusted Value using Total Station 120 KM.
  • Determining Elevation and adjusted Value using Auto level 120 KM .
  • Cross Section work (Drawing).
  • Topographic Survey.
  • Road alignment and Structure layout.
  • Fixing of Bridge and Road Alignment
During three month period the main job is to make verification of benchmark that fixing by another party. Make new measurement for Control Point (Benchmark) with three dimension coordinate for approval to engineer. Topographic survey along proposed alignment using Total Station for design plan. Design of Road Alignment (horizontal & vertical) and applied the design to site.