skip to main | skip to sidebar

AGUNG WIBOWO

Monday, May 19, 2008

CONSTRUCTION OF CABLE TUNNEL AND COURUGATED STEEL PIPE (TCFSPP) PROJECT:

CONTRUCTION OF CABLE TUNNEL WITH THE DIMENSION OF: 2.5 m Width, 3.5m Height and Total length is 700m
Courugated Steel Pipe Instalation
Diameter : 3.1 meter
Total Lentgh 1200 meter.
Position 5m under surface
ground.








Posted by wibowo at 7:11 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2008 (16)
    • ▼  May (16)
      • PROFILE AGUNG WIBOWO
      • Project Experience - 1 Deputy Engineering Manager
      • Project Experience - 2 ------ Survey & Alignment E...
      • Construction Picture of Major Bridge ADB Railawy P...
      • Construction Picture Of Building, Minor Bridges & ...
      • Surveying Picture (ADB PROJECT)
      • Project Experience-3 SURVEY ENGINEER
      • Project Experience-4 (TCFSPPP)CHIEF SURVEYOR
      • BUILDING CONSTRUCTION (TCFSPPP) PROJECT:
      • PILING WORK (TCFSPPP) PROJECT:
      • LAYOUT OF (TCFSPPP) PROJECT:
      • SURVEYING DOCUMENTATION (TCFSPP) PROJECT
      • SOIL INVESTIGATION (TCFSPP) PROJECT:
      • CONSTRUCTION OF CABLE TUNNEL AND COURUGATED STEEL ...
      • Project Experience-5 (GIS)
      • Project Experience -6 SITE ENGINEER
  • ►  2011 (3)
    • ►  November (3)

Site Links

  • Adhi Karya
  • Teknik Geodesi UGM

Free Blog Calendar
Oil Rig Accident Lawyer
Oil Rig Accident Lawyer Counter