Sunday, May 18, 2008

Project Experience - 2 ------ Survey & Alignment Engineer

July 2006 To February 2008

HCIL-ADHI KARYA-ARSS (JV) ---- India

Construction of Doubling of Railway Line Between Barang-Rajatgarh (25 KM), Cuttack-Barang (12 KM), and 3rd Line Between Barang to Khurda Road (35 KM).

Funded by (ADB-Bank)

As a Survey & Alignment Engineer

This work are Includes :


Preliminary Survey Work for Construction
  • Benchmark Verification
  • Establishment Benchmark & Value using GPS and Total Station .
  • Establishment Benchmark Elevation Value using Auto level.
  • Cross Section work ( Measurement & Drawing).
  • Topographic Survey Work for construction planning.
  • Prepared Total layout of Structure entire work area.
  • Alignment Design (Vertical and Horizontal)
Construction Work.
  • Alignment Design (Vertical and Horizontal)
  • Construction of Ro adbed and Minor Bridges
  • Conctruction Major Bridge Super Structure RCC Box Girder 20 Span @ 45.1m
  • Construction Super Structure of Major Bridge Stell Truss 20 span @ 45 m.
  • Major Bridge Cons truction Sub and Super Structure use Well sinking foundation and RCC Box Gorder 20 span @ 45 m.C
  • Construction of 21 Major Bridges PCI girder, Steel Truss, and Box girder.
  • Construction of 2 tower Quarter Bulding each 9 floor.
  • Piling work for major bridges and building foundation.
  • Well sinking foundation work.
  • Construction of 6 new station
  • Responsible of 10 surveyor.
During construction work i also manage weekly and monthly report for progress (quantity calculation) for earth work, and provide surveying support data to engineering department for designing purpose and construction work. Alignment review and design is also part of my duty.