PILING WORK (TCFSPPP) PROJECT:


BORED PILE LAYOUT FOR COAL SILO

Bored Pile Diameter is 1000mm
Number of Bored pile is 600 Nos






PILING LAYOUT
For Boiler Foundation
Using Steel Pipe Pile
Diameter : 600mm
Depth : 50m
Number of Pile : 350 Nos



PILING LAYOUT
For Power House Foundation
Using Steel Pipe Pile
Diameter : 600mm
Depth : 50m
Number of Pile : 415 Nos







BORED PILE WORK With 1.0m Diameter and 40m Depth










Pouring Concrete for Bored Pile









Pile Load Test:






Pile Driving (Concrete Pile)
Used Diesel Hummer. With Varies of diametre
(300,350,400,500)mm