Tuesday, May 20, 2008

Project Experience -6 SITE ENGINEER

Nov 1999 May 2003 Mitra Construction. PT , Jakarta-Indonesia.

Development of Residential Housing and Infrastructure in South Jakarta



As a SITE ENGINEER


  • Developing Housing and Infrastructure

  • Topographic survey and Design of Site plan

  • Housing construction for residential

  • Road construction.

  • Minor bridge construction

Project Experience-5 (GIS)

May 2003 To Feb 2004 ------- Enviro Consultama, Surabaya - Indonesia

Geographic Information System Project for Planning and Maintenance of Road and Bridge using Arch View Software
LEAD Engineer for Geographic Information System.

This Work are Includes:
  • Manage the site activity to obtain site data.
  • Prepared the database using Microsoft Access.
  • Prepared drawing using AutoCAD.
  • Build the Geographic Information System using Arc View Software.
  • Preparing the Tutorial/Manual Book.
  • Short training for user (employer) the Information system using Arch View Software.
  • Final Report

Monday, May 19, 2008

CONSTRUCTION OF CABLE TUNNEL AND COURUGATED STEEL PIPE (TCFSPP) PROJECT:

CONTRUCTION OF CABLE TUNNEL WITH THE DIMENSION OF: 2.5 m Width, 3.5m Height and Total length is 700m
Courugated Steel Pipe Instalation
Diameter : 3.1 meter
Total Lentgh 1200 meter.
Position 5m under surface
ground.








SOIL INVESTIGATION (TCFSPP) PROJECT:

SAFETY MEETING PRIOR STARTING THE WORKS

SOIL INVESTIGATION

OFF SHORE SOIL INVESTIGATION

SURVEYING DOCUMENTATION (TCFSPP) PROJECT

DGPS BASE STATION SETUP FOR BATHIYMATRIC SURVEY.

TIDAL MEASUREMENT

HIDROGRAPHIC SURVEY EQUIPMENT SETUP ON BOARD

DGPS BASE ANTENA WITH SURVEY BOARD AS A BACKGROUND








BENCHMARK VERIFICATION AND ESTABLIHMEN NEW BENCHMARK



PRELIMINARY SURVEY (TOPOGRAPHY SURVEY)









SURVEY NEAR TRAFIC




SETTING OUT

LAYOUT OF (TCFSPPP) PROJECT:

MAIN LAYOUT OF PROJECT: Commencement date of project is March 2004 and finish on September 2006. This work are Civil Work, Building and Piling Package





ALL OVER VIEW ENTIRE PROJECT AREA AFTER COMPLETION WORK.


MAIN AREA OVERVIEW AFTER COMPLETION WORK

VIEW OF FLY OVER, SWITCHYARD, CONTROL BUILDING. AFTER COMPLETION WORK.

PILING WORK (TCFSPPP) PROJECT:


BORED PILE LAYOUT FOR COAL SILO

Bored Pile Diameter is 1000mm
Number of Bored pile is 600 Nos






PILING LAYOUT
For Boiler Foundation
Using Steel Pipe Pile
Diameter : 600mm
Depth : 50m
Number of Pile : 350 Nos



PILING LAYOUT
For Power House Foundation
Using Steel Pipe Pile
Diameter : 600mm
Depth : 50m
Number of Pile : 415 Nos







BORED PILE WORK With 1.0m Diameter and 40m Depth










Pouring Concrete for Bored Pile









Pile Load Test:






Pile Driving (Concrete Pile)
Used Diesel Hummer. With Varies of diametre
(300,350,400,500)mm

BUILDING CONSTRUCTION (TCFSPPP) PROJECT:


Front view of Administration Building Construction 4 stories.
(Tarahan Coal Fire Steam Power Plat Project)














Side view of Administration Building Construction 4 stories.
(Tarahan Coal Fire Steam Power Plat Project)

Sunday, May 18, 2008

Project Experience-4 (TCFSPPP)CHIEF SURVEYOR

February 2004 To May 2006

TOA CORPORATION - PT.ADHI KARYA (Joint Operation)

Jakarta,Indonesia



TARAHAN COAL FIRED STEAM POWER PLANT PROJECT,

CIVIL WORK AND PILING --- (LAMPUNG INDONESIA)


As a CHIEF SURVEYOR


Preliminary Survey for Construction

  • Benchmark Verification
  • Determining Benchmark Coordinate Value using Total Station.
  • Determining Benchmark Elevation Value using Auto level.
  • Hydrographic ( Bathymetry) Survey for Discharge Outlet Area.
  • Topographic Survey
  • Cross Section Work

Construction Work
  • Piling Work (PC Pile) Dia 300mm, 400mm, 450mm, 500mm for building Foundation (2500 Nos).
  • Piling Works (Steel Pipe Pile) Dia 612mm (1500 Nos) for Turbine Generator and Power House Foundation
  • Bored Pile Work Dia 1000mm,800mm (700 Nos)
  • Construction of Circulating Sea Water Pump Pit (Underground Structure)
  • Construction of Administration Building 5th floor.
  • Construction of Balance of Plant Building 4th floor.
  • Construction of Intake tunnel 3x4x600 meter, Underground Structure.
  • Construction/Installation of Corrugated Steel Pipe Dia 3.1 meter and 2.2 meter, 1200 meter long (underground pipe) for Discharge Outlet.
  • Construction of Fly Over Bridge for coal transportation.
  • Construction of Road inside Power Plan Area 4000 meter length.
  • Construction of Ash Disposal Area 12 Hectare, cut, fill and embankment.
  • Construction of Pipe Sleeper.
  • Construction of Oil Storage Tank Found.
  • Construction of Water Storage Tank.
  • Construction of Drainage System inside Power Plan using Hume Pipe.
  • Construction of Waste Waste Water Storage Pond.
  • Construction of Oil Storage Tank Foundation.
  • Responsible 8 Team of Surveyor.


Project Experience-3 SURVEY ENGINEER

February 2006 To April 2006

ADHI KARYA.PT ------------ Aceh, Indonesia

URGENT RECOVERY OF THE WEST COAST ROAD

BANDA ACEH AND MEULABOH PROJECT (CALANG MEULABOH SECTION )

KM. 155+630 to KM 270+000.

**AFTER TSUNAMI DISASTER..


As a SURVEY ENGINEER



Preliminary Survey for Construction

  • Establishment New Benchmark
  • Determining Benchmark (Establishment New Benchmark) Coordinate adjusted Value using Total Station 120 KM.
  • Determining Elevation and adjusted Value using Auto level 120 KM .
  • Cross Section work (Drawing).
  • Topographic Survey.
  • Road alignment and Structure layout.
  • Fixing of Bridge and Road Alignment
During three month period the main job is to make verification of benchmark that fixing by another party. Make new measurement for Control Point (Benchmark) with three dimension coordinate for approval to engineer. Topographic survey along proposed alignment using Total Station for design plan. Design of Road Alignment (horizontal & vertical) and applied the design to site.

Surveying Picture (ADB PROJECT)

GPS Survey, used for benchmark verification. Establishment New Control Point (Benchmark) by post Processing.






Total Station Survey, topographic survey, benchmark verification and Establishment new Benchmark, Setting out and construction survey work .






Survey Near Rail Road/trafic using Total Station.









Leica Laser Sprinter for Leveling work.

Construction Picture Of Building, Minor Bridges & Earth Work (ADB Project


CONSTRUCTION OF 2 TOWER OF QUARTER BUILDING 9 FLOOR EACH






MINOR BRIDGE AFTER FINISH CONCRETING



ROADBED WORK/ EMBANKMENT FOR RAILWAY LINE








ROADBED WORK ON STAION YARD AREA

Construction Picture of Major Bridge ADB Railawy Project (India):

Major Bridge Work:
Drawing above is general arrangement design of bridge No.553 at location of Kathajodi River, with sub and super structure. Sub structure of this bridge using Well sinking foundation , and super structure using PSC BOX GIRDER.
Dimension of the foundation is:

  • Outer radius of well : 8m
  • Inner radius of well : 4m
  • Depth of foundation : 50m
This Bridge having span of 45.1m anda total number of span is 20. Total length of bridges 902m.

Construction Picture:
The above picture is layout of bridge No 553 where Abutment 1 on the right side and abutment 2 on left side. This picture shown existing bridge using steel truss, proposed new bridge will be used RCC BOX Girder for super structure and Well foundation for Sub structure (foundation work is going on).

Bridge No.32 (Puri Canal)
This bridge is three span ( 2 span PS I Girder 12.5m and 1 span Steel truss 30.5m in the middle position)
On this picture Structure of PS I girder complete and steel truss under construction. l be be .





Left side picture is well foundation after pouring concrete and remove the form work, this well are ready to be sinking. By excavate soil inside well by clamp shell and crane, with own weight this well will be sink. During sinking process tilting and shifting of the well foundation position must be monitored.














Stressing process of PS I girder.
































The above drawing shown shuttering / form work arrangement and picture inside box girder after finish pouring concrete and remove of shuttering.















Project Experience - 2 ------ Survey & Alignment Engineer

July 2006 To February 2008

HCIL-ADHI KARYA-ARSS (JV) ---- India

Construction of Doubling of Railway Line Between Barang-Rajatgarh (25 KM), Cuttack-Barang (12 KM), and 3rd Line Between Barang to Khurda Road (35 KM).

Funded by (ADB-Bank)

As a Survey & Alignment Engineer

This work are Includes :


Preliminary Survey Work for Construction
  • Benchmark Verification
  • Establishment Benchmark & Value using GPS and Total Station .
  • Establishment Benchmark Elevation Value using Auto level.
  • Cross Section work ( Measurement & Drawing).
  • Topographic Survey Work for construction planning.
  • Prepared Total layout of Structure entire work area.
  • Alignment Design (Vertical and Horizontal)
Construction Work.
  • Alignment Design (Vertical and Horizontal)
  • Construction of Ro adbed and Minor Bridges
  • Conctruction Major Bridge Super Structure RCC Box Girder 20 Span @ 45.1m
  • Construction Super Structure of Major Bridge Stell Truss 20 span @ 45 m.
  • Major Bridge Cons truction Sub and Super Structure use Well sinking foundation and RCC Box Gorder 20 span @ 45 m.C
  • Construction of 21 Major Bridges PCI girder, Steel Truss, and Box girder.
  • Construction of 2 tower Quarter Bulding each 9 floor.
  • Piling work for major bridges and building foundation.
  • Well sinking foundation work.
  • Construction of 6 new station
  • Responsible of 10 surveyor.
During construction work i also manage weekly and monthly report for progress (quantity calculation) for earth work, and provide surveying support data to engineering department for designing purpose and construction work. Alignment review and design is also part of my duty.



Project Experience - 1 Deputy Engineering Manager

February, 2008 -- Till Date

HCIL-ADHI KARYA (JV) ------ India
Construction of Roadbed Including Major and Minor Bridges, Facilities and General Electrification in Connection with Construction of New BG line (82 KM) Between Haridaspur & Paradeep In East Coast Railway. In The State of Orissa, INDIA.


Deputy Engineering Manager


This work is including :
  • Benchmark Verification (Given by Employer) & Establishment New Benchmark.
  • Topographic Survey Work for Construction planning and design.
  • Preparing Total layout of structure entire work area.
  • Minor and Major Bridge Construction.
  • Cross Section Drawing.
  • Earth Work Quantity Calculation.
  • Revise Horizontal and Vertical Alignment.
  • Ground Improvement using Vertical Drain
Total length of project approximate 82,1 kilometer, with the number of structure is.

Major bridges : 44 number
With varies of structure type. (well foundation, PSC Slab, bored pile foundation, PSC I Girder, and PSC BOX girder)

Minor bridges : 207
With structure type is ( Box Culvert, Hume pipe Culvert)

Estimate total quantity of earth work is : 7.140.000 Cubic Meter.


Saturday, May 17, 2008

PROFILE AGUNG WIBOWO

Name : Agung Wibowo

Date of Birth : Agustus 1973

Nationality : Indonesia


Qualification : Bachelor Degree in Geodetic Engineering (Gadjah Mada University)

Specialization : Civil/Construction, Survey, Land Survey, Geographics Information System, Mine Survey&Construction

Email :
wb.agung@gmail.com , wb_agung@yahoo.co.id





Project Experience:
1. 1999 to 2003------- Mitra Construction. PT , Jakarta-Indonesia.

As Site Engineer (Housing Project)


2. 2003 -- 2004 ------- Enviro Konsultama, Surabaya - Indonesia
As GIS Project Leader

  3. 2004 -- 2006 ------- TOA CORPORATION - PT.ADHI KARYA (Joint Operation)  

 As Chief Surveyor
Indonesia
(Power Plant Project)


4. 2006 --------- ADHI KARYA.PT.                                                 Aceh, Indonesia
As Survey Engineer
(Highway Project)

5. 2006 -- 2008 ----- HCIL-ADHI KARYA-AARSS (JV) --            INDIA
As Survey and Alignment Engineer
(Railway Project)

6. 2008 -- HCIL-ADHI KARYA (JV) ----                                          INDIA
As Deputy Engineering Manager
(Railway Project)

 
7. 2008 Wonjin ----                                                                            Saudi Arabia
As Senior Highway Engineer
(Highway Project)
 

8. 2008~2010 ----- TOA Corporation 

 Civil Engineer
(Power Plant Project)

9. 2010 ~ Till Date ----- PT Freeport Indonesia  

 Chief Engineer
(
Mining Construction & Survey )

----ooooOOOOoooo-----


COMPUTER SKILL:

  1. MS Office (Word, Excel, Popwer Point, MS Access, Outlook)
  2. MS Project
  3. Correl Draw
  4. Adobe PhotoShop
  5. Prolink
  6. TOPCONLink
  7. AutoCAD 2D
  8. AutoCAD LAnd Desktop
  9. AutoCAD Civil 3D
  10. Surpac
  11. Surver
  12. SKI
  13. ArchView
  14. ER Mapper
  15. 12D
  16. Vulcan
Surveying Instrument:
  1. GPS (Leica, Garmin, TopCon)
  2. Autolevel (All Type)
  3. Total Station  (Sokkia, Leica, Topcon)
  4. Theodolite (All Type)