DGPS BASE STATION SETUP FOR BATHIYMATRIC SURVEY.
TIDAL MEASUREMENT
HIDROGRAPHIC SURVEY EQUIPMENT SETUP ON BOARD
DGPS BASE STATION SETUP FOR BATHIYMATRIC SURVEY.
TIDAL MEASUREMENT
HIDROGRAPHIC SURVEY EQUIPMENT SETUP ON BOARD
MAIN LAYOUT OF PROJECT: Commencement date of project is March 2004 and finish on September 2006. This work are Civil Work, Building and Piling Package
ALL OVER VIEW ENTIRE PROJECT AREA AFTER COMPLETION WORK.
MAIN AREA OVERVIEW AFTER COMPLETION WORK
VIEW OF FLY OVER, SWITCHYARD, CONTROL BUILDING. AFTER COMPLETION WORK.

BORED PILE LAYOUT FOR COAL SILO
Bored Pile Diameter is 1000mm
Number of Bored pile is 600 Nos
PILING LAYOUT
For Boiler Foundation
Using Steel Pipe Pile
Diameter : 600mm
Depth : 50m
Number of Pile : 350 Nos
PILING LAYOUT
For Power House Foundation
Using Steel Pipe Pile
Diameter : 600mm
Depth : 50m
Number of Pile : 415 Nos
BORED PILE WORK With 1.0m Diameter and 40m Depth
Pouring Concrete for Bored Pile
Pile Load Test:
Pile Driving (Concrete Pile)
Used Diesel Hummer. With Varies of diametre (300,350,400,500)mm

Front view of Administration Building Construction 4 stories.
(Tarahan Coal Fire Steam Power Plat Project)
Side view of Administration Building Construction 4 stories.
(Tarahan Coal Fire Steam Power Plat Project)
February 2004 To May 2006
TOA CORPORATION - PT.ADHI KARYA (Joint Operation)
Jakarta,Indonesia
TARAHAN COAL FIRED STEAM POWER PLANT PROJECT,
CIVIL WORK AND PILING --- (LAMPUNG INDONESIA)
As a CHIEF SURVEYOR
Preliminary Survey for Construction
February 2006 To April 2006
ADHI KARYA.PT ------------ Aceh, Indonesia
URGENT RECOVERY OF THE WEST COAST ROAD
BANDA ACEH AND MEULABOH PROJECT (CALANG MEULABOH SECTION )
KM. 155+630 to KM 270+000.
**AFTER TSUNAMI DISASTER..
As a SURVEY ENGINEER
Preliminary Survey for Construction
GPS Survey, used for benchmark verification. Establishment New Control Point (Benchmark) by post Processing.
Total Station Survey, topographic survey, benchmark verification and Establishment new Benchmark, Setting out and construction survey work .
Survey Near Rail Road/trafic using Total Station.
Leica Laser Sprinter for Leveling work.