PROJECT EXPERIENCE (PT FREEPORT INDONESIA)


OPEN PIT OVERVIEW


HEAD CONVEYOR ERECTION ON PROGRESS
CONVEYOR TABLE ERECTION

FINISH CONVEYOR LINE CONSTRUCTION

FINISH CONVEYOR LINE CONSTRUCTION

OFFICE BUILDING FOUNDATION AND ERECTION

OFFICE BUILDING FOUNDATION AND ERECTION



HEAVY LOAD TRANSPOTATION

UNDERGROUND BEFORE STARTING CONSTRUCTION

UNDERGROUND CONSTRUCTION O PROGRESS




















PROJECT EXPERIENCE (PAITON-3 EXPANSION POWER PLANT PROJECT)


CW- PMP PIT AREA (TOP SLAB CASTING)


PROJECT OVERVIEW
PROJECT OVERVIEW


COAL FIRE STEAM POWER PLANT - PAITON OVERVIEW























Project Experience Saudi Arabia Project

Dhurma Shaqra Highway Project 110-Km. 

Earth Work


















Earth Work


















Minor Bridge Conect to xisting Bridge (After Excavation)


















Finish Bridge Construction

















Finish Bridge Construction

















Asphalt Layering

















Roughness Test


















Finish Road














Tuesday, May 20, 2008

Project Experience -6 SITE ENGINEER

Nov 1999 May 2003 Mitra Construction. PT , Jakarta-Indonesia.

Development of Residential Housing and Infrastructure in South Jakarta



As a SITE ENGINEER


  • Developing Housing and Infrastructure

  • Topographic survey and Design of Site plan

  • Housing construction for residential

  • Road construction.

  • Minor bridge construction

Project Experience-5 (GIS)

May 2003 To Feb 2004 ------- Enviro Consultama, Surabaya - Indonesia

Geographic Information System Project for Planning and Maintenance of Road and Bridge using Arch View Software
LEAD Engineer for Geographic Information System.

This Work are Includes:
  • Manage the site activity to obtain site data.
  • Prepared the database using Microsoft Access.
  • Prepared drawing using AutoCAD.
  • Build the Geographic Information System using Arc View Software.
  • Preparing the Tutorial/Manual Book.
  • Short training for user (employer) the Information system using Arch View Software.
  • Final Report

Monday, May 19, 2008

CONSTRUCTION OF CABLE TUNNEL AND COURUGATED STEEL PIPE (TCFSPP) PROJECT:

CONTRUCTION OF CABLE TUNNEL WITH THE DIMENSION OF: 2.5 m Width, 3.5m Height and Total length is 700m
Courugated Steel Pipe Instalation
Diameter : 3.1 meter
Total Lentgh 1200 meter.
Position 5m under surface
ground.








SOIL INVESTIGATION (TCFSPP) PROJECT:

SAFETY MEETING PRIOR STARTING THE WORKS

SOIL INVESTIGATION

OFF SHORE SOIL INVESTIGATION